This project is for the construction of the FTG218D MF4 Construction Package #04 (CP#04) which includes all of the infrastructure associated with Missile Field 4 (excluding MEB 4) to include; SILO Liners, SILO Foundations, SIV Foundations, Utilidors and associated piping. A and B shielded power duct bank and cabling, A&B communications duct bank and cabling, all utility home runs from the backbone to each SIV, fencing, gates, Electronic Security System, grading, roads, pavement, grounding, lighting and lightning protection.